Today work on the bathroom got started. We had made sure that Lowe’s would deliver the tub, toilet and such today. The vanity, top and sink are not in. We pick up the floor tiles tonight. After dealing with plumbing work, the tub went in. The pictures show their morning work. I’m in the loft and they are drilling. I wonder when we can us it???
No comments:
Post a Comment